Abberton - Ouse Water Transfer Scheme
Index Page
Previous Page
Next Page
![](thumbs/abberton%20001.jpg)
Top Soil removed looking towards the River Stour ![](thumbs/abberton%20003.jpg)
Top Soil removed looking towards the River Stour ![](thumbs/abberton%20004.jpg)
Archealogical test dig in foreground ![](thumbs/abberton%20007.jpg)
Top Soil removed looking towards the River ![](thumbs/abberton%20008.jpg)
Excavations base of Lodge Hill ![](thumbs/abberton%20009.jpg)
Top Soil removed looking towards the River ![](thumbs/abberton%20010.jpg)
Excavations base of Lodge Hill ![](thumbs/abberton%20011%20(2).jpg)
Top soil removed ready for trench work ![](thumbs/abberton%20011%20(6).jpg)
Taken from the foot of Lodge Hill ![](thumbs/pipes%20001.jpg)
Crane ready for pipe lift ![](thumbs/pipes%20003.jpg)
Pipe ![](thumbs/pipes%20007.jpg)
4ft wide x 48ft long pipe ![](thumbs/pipes%20008.jpg)
Pipe ![](thumbs/pipes%20010.jpg)
Pipes looking towards Lodge Hill ![](thumbs/pipes%20march%205%20005.jpg)
Pipes ready for welding ![](thumbs/pipes%20march%205%20006.jpg)
Pipes ![](thumbs/pipes%20march%205%20009.jpg)
4ft wide x 48ft long pipe ![](thumbs/pipes%20wormingford%20003.jpg)
Two JCB`s in tandem lifting pipe ![](thumbs/pipesfeb%20009.jpg)
Taken from top of Lodge Hill ![](thumbs/pipes%20wormingford%20006.jpg)
Lorry waiting to unload in Wormingford ![](thumbs/pipes%20march%205%20003.jpg)
Welding pipes, gantry to give pipe clearance underneath for welding ![](thumbs/pipes%20march%205%20002.jpg)
Welding pipes, gantry to give pipe clearance underneath for welding ![](res/sp.gif)
![](thumbs/welding%200099.jpg)
Welding ![](thumbs/pipes%20finished%20004.jpg)
Finished weld, one pipe slides into the other (E-fit), welded and then plastic
coated ![](thumbs/welding%20002.jpg)
Unable to weld due to excessive water in trench ![](thumbs/pipesmarch%20001.jpg)
Unable to weld due to excessive water in trench ![](thumbs/pipes%20finished%20007.jpg)
Inspection hatch enabling access to pipe ![](thumbs/pipes%20finished%20008.jpg)
Steel frame supporting trench side walls whilst welding ![](thumbs/pipes%20finished%20003.jpg)
Pipe layed and field ready for reinstatement ![](thumbs/break%20pressure%20tank%20001.jpg)
Break Pressure Tank Fordham Road ![](thumbs/crane.jpg)
Commencing Pile Drivind at the River Stour Pumping Station ![](thumbs/crane3.jpg)
Commencing Construction of the Staunch Farm Pumping Station - Sept 2011 ![](thumbs/staunch 001.jpg)
Commencing Construction of the Staunch Farm Pumping Station - Sept 2011 ![](thumbs/staunch 004.jpg)
Commencing Construction of the Staunch Farm Pumping Station - Sept 2011 ![](thumbs/pumping stn 003.jpg)
Pumping Staion Fordham Road - Sept 2011 ![](thumbs/restored fields 001.jpg)
Restored Fields looking towards Staunch Farm, July 2012 ![](thumbs/restored fields 004.jpg)
Restored Fields looking towards Staunch Farm, July 2012 ![](thumbs/pumping2012.jpg)
Pumping Station waiting for Landscaping Luly 2102![](thumbs/DSCF2079.jpg)
River Stour Pumping Station July 2012![](thumbs/DSCF2082.jpg)
River Stour Pumping Station July 2012![](thumbs/july.jpg)
River Stour Pumping Station December 2012![](thumbs/dec12.jpg)
River Stour Pumping Station December 2012![](thumbs/dec121.jpg)
Pumping Staion intake gates for pumps December 2012![](thumbs/dec122.jpg)
Pumping Staion intake gates for pumps December 2012![](thumbs/dec123.jpg)
Pumping Staion intake gates for pumps December 2012![](thumbs/final1.jpg)
Wormingford Break Tank Complete December 2012![](thumbs/final2.jpg)